• partial_accumen@lemmy.world
    link
    fedilink
    arrow-up
    20
    ·
    9 months ago

    A current working theory (from people more expert than me) is that Spirit Aerosystems (who builds the fuselage) does a loose install of the door for transport to Boeing, who then does a final install of the interior. Since this door is usually removed for the interior installation the theory is that it isn’t and the loose install is what has ended up on otherwise flight worthy planes.

    • Semi-Hemi-Demigod@kbin.social
      link
      fedilink
      arrow-up
      26
      ·
      9 months ago

      Here’s how I think it went down:

      Conference Room, Spirit Aerosystems:

      “How can we reduce the hours needed to get the fuselages out of the door?”

      “We could skip tightening the door plug bolts. After all, they use them at Boeing to finish the interiors so it will actually save them time, too.”

      “Johnson, get this man a promotion!”


      Later that year

      Conference Room, Boeing

      “How can we reduce the hours needed to finish these interiors?”

      “We could just skip removing the door plugs and do it all from the actual doors. Then we don’t have to re-do something already done at the supplier”

      “Johnson, get this man a promotion!”

          • Strykker@programming.dev
            link
            fedilink
            arrow-up
            4
            ·
            9 months ago

            Always seems weird to me, like they aren’t going to be making plans bodies for many other customers, so now Boeing has to pay extra for each body since now spirit aerosystems wants to have growing profits on every thing they make.

    • HootinNHollerin@lemmy.world
      link
      fedilink
      arrow-up
      1
      ·
      edit-2
      9 months ago

      I was recently in Wichita at the airport where spirit aerosystems builds fuselages and could see a large Boeing plane that transports the fuselage inside it to Washington to be finished